DanskEnglish

Bridge section arrives

05/12/2019

For the City of Copenhagen, Bladt Industries A / S carries out a bicycle & pedestrian bridge across the Folehaven – on the picture you can see the main piece for the bridge, which will connect the northern and southern parts of Vigerslevparken. The bridge section is 32 m long, 5.5 m wide and weighs 32 tons. After mounting the masts and drawbars, the bridge trade will weigh 42 tons, and the bridge trade will be lifted in place in the period were Folehaven is blocked. 

For more info (Danish): https://www.kk.dk/nyheder/holbaekmotorvejen-bliver-lukket-naar-kraner-loefter-brofag-paa-plads